Refine your search:     
Report No.
 - 
Search Results: Records 1-6 displayed on this page of 6
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

HTTR-GT/H$$_{2}$$ test plant; System performance evaluation for HTTR gas turbine cogeneration plant

Sato, Hiroyuki; Nomoto, Yasunobu*; Horii, Shoichi*; Sumita, Junya; Yan, X.

Nuclear Engineering and Design, 329, p.247 - 254, 2018/04

 Times Cited Count:12 Percentile:76.73(Nuclear Science & Technology)

This paper presents the system performance evaluation for HTTR gas turbine cogeneration test plant (HTTR-GT/H$$_{2}$$ plant) so as to confirm that the design meets the requirements with respect to the demonstration test objective. Start-up and shut down operation sequences as well as operability of load following operation were investigated. In addition, system dynamic and control analyses for the test plant in the events of loss of generator load and upset of H$$_{2}$$ plant were performed. The simulation results presented in the paper show that the test plant is suitable for the test bed to validate control schemes against postulated transients in the GTHTR300C. The results also lead us to the conclusion that HTTR-GT/H$$_{2}$$ plant can be used to test operational procedures unique to HTGR direct-cycle gas turbine cogeneration.

Journal Articles

Design of HTTR-GT/H$$_{2}$$ test plant

Yan, X.; Sato, Hiroyuki; Sumita, Junya; Nomoto, Yasunobu*; Horii, Shoichi*; Imai, Yoshiyuki; Kasahara, Seiji; Suzuki, Koichi*; Iwatsuki, Jin; Terada, Atsuhiko; et al.

Nuclear Engineering and Design, 329, p.223 - 233, 2018/04

 Times Cited Count:20 Percentile:90.01(Nuclear Science & Technology)

The pre-licensing design of an HTGR cogeneration test plant to be coupled to JAEA's existing test reactor HTTR is presented. The plant is designed to demonstrate the system of JAEA commercial plant design GTHTR300C. With construction planned to be completed around 2025, the test plant is expected to be the first-of-a-kind nuclear system operating on two of the advanced energy conversion systems attractive for the HTGR closed cycle helium gas turbine for power generation and thermochemical iodine-sulfur water-splitting process for hydrogen production.

JAEA Reports

Design database of helium gas turbine for HTTR-GT/H$$_{2}$$ test plant (Revised version)

Imai, Yoshiyuki; Sato, Hiroyuki; Yan, X.

JAEA-Data/Code 2017-011, 39 Pages, 2017/08

JAEA-Data-Code-2017-011.pdf:2.93MB

This report is the revised version of the report titled "Design Database of Helium Gas Turbine for High Temperature Gas-cooled Reactor, JAEA-Data/Code 2016-007" reflecting component design and experimental data analysis results for fission product isotope diffusion through the turbine blade alloy conducted in Fiscal Year 2016.

JAEA Reports

Design database of helium gas turbine for high temperature gas-cooled reactor

Imai, Yoshiyuki; Sato, Hiroyuki; Nomoto, Yasunobu; Yan, X.

JAEA-Data/Code 2016-007, 27 Pages, 2016/08

JAEA-Data-Code-2016-007.pdf:3.65MB

This report provides design database for helium gas turbine for HTGR. The design details for secondary helium cooling system and helium gas turbine in a heat application system to be coupled to the HTTR are described. In addition, experimental data for fission product isotope diffusion through turbine blade alloy is compiled.

Journal Articles

HTTR demonstration program for nuclear cogeneration of hydrogen and electricity

Sato, Hiroyuki; Yan, X.; Sumita, Junya; Terada, Atsuhiko; Tachibana, Yukio

Journal of Nuclear Engineering and Radiation Science, 2(3), p.031010_1 - 031010_6, 2016/07

This paper explains the outline of HTTR demonstration program with a plant concept of the heat application system directed at establishing an HTGR cogeneration system with 950$$^{circ}$$C reactor outlet temperature for production of power and hydrogen as recommended by the task force. Commercial deployment strategy including a development plan for the helium gas turbine is also presented.

Journal Articles

Feasibility design study of compact heat exchanger for HTGR gas turbine systems

Ishiyama, Shintaro; Muto, Yasushi; Kasaba, Michihiro*; Kaneta, Takayoshi*

Nihon Genshiryoku Gakkai-Shi, 42(3), p.196 - 203, 2000/03

 Times Cited Count:1 Percentile:12.08(Nuclear Science & Technology)

no abstracts in English

6 (Records 1-6 displayed on this page)
  • 1